Well, I'm posting this a day early to try to get a feel for how many guys I need to buy beer and food for. Here are the details so far:
TRP 150 will show with the pilings at the ramp around 7:30am. It will take 2 runs to get them out there. We haul them out of the boat. We dig a hole as far down as we can, pretty easy digging out there. We set up the A-frame above the target and haul up the piling. We set the piling in and turn on the pump with a few people hauling down on the piling and the help of gravity, we get it down to the target depth. 4 16 footers and one 12 footer and the tough part is done. The frame and walkway come next and we'll get done what we can get done before a big supper and fishin' under the lights.
Tom will be there and hopefully Bob as well. Me and VJER are in and TRP says that although he may have to cut out after delivery, he may be able to leave an indentured servant with us. The more the merrier, and the faster we can get it all done. So let me know if you can come out. - Sandy
TRP 150 will show with the pilings at the ramp around 7:30am. It will take 2 runs to get them out there. We haul them out of the boat. We dig a hole as far down as we can, pretty easy digging out there. We set up the A-frame above the target and haul up the piling. We set the piling in and turn on the pump with a few people hauling down on the piling and the help of gravity, we get it down to the target depth. 4 16 footers and one 12 footer and the tough part is done. The frame and walkway come next and we'll get done what we can get done before a big supper and fishin' under the lights.
Tom will be there and hopefully Bob as well. Me and VJER are in and TRP says that although he may have to cut out after delivery, he may be able to leave an indentured servant with us. The more the merrier, and the faster we can get it all done. So let me know if you can come out. - Sandy




Comment